Implementing kanban concept in production planning and control for a domestic precast manufacturing plant

dc.contributor.authorLow, Pei Ying
dc.date.accessioned2021-05-18T01:40:12Z
dc.date.available2021-05-18T01:40:12Z
dc.date.issued2017-06
dc.description.abstractProduction planning and control (PPC) are key factor for a success in production. This study aims to identify the current planning and control methods in production line in Malaysia local based manufacturing plant which is called as MDC Precast Industries Sdn. Bhd. The machine used, number of operators needed and cycle time for each process are collected in order to investigate the current planning and controls in production line. Then, pareto chart is mapped to identify the root cause of low performance of machine. Current production model and Kanban production model are simulated using SimEvents software. Kanban concept is implemented in replenishment raw material which is steel cage and hook. New scheduling is suggested to avoid the machine idling. As a result, machine utilization was increased from 56.4% to 80% and no waiting time for the ready-mix supplier. Therefore, with proper scheduling and applying Kanban tool will increase the efficiency of the production.en_US
dc.identifier.urihttp://hdl.handle.net/123456789/13442
dc.language.isoenen_US
dc.titleImplementing kanban concept in production planning and control for a domestic precast manufacturing planten_US
dc.typeOtheren_US
Files
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: