Publication: Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects
Loading...
Date
2019-07
Authors
Bulba, Alfa Taras
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Performance-based Contract (PBC) was applied in Indonesia national road as
new approchment to substitute traditional way as commonly used. There are issues
affect to PBC because of overloading, side friction, swampy, emergency and
disputes. By this reason, PBC was modified to Long Segment Maintenance Contract
(LSMC). Local contractors is force to construct and maintain in the same time at the
length of territorial segment by performance measurement. However, due to of
cultural changes, contractors are not realizing and optimizing their performance. The
firm’s insufficient of resources and capability may have negative effect on
contractor performance. Hence, maintaining LSMC by providing right determinant
and operational capabilities in improving contractor performance.
Description
Keywords
Contractor Performance , Road Delivery