KAJIAN TAHAP PEMATUHAN SPESIFIKASI PIAWAI ELEKTRIK OLEH KONTRAKTOR KEJURUTERAAN ELEKTRIK DALAM PROJEK PEMBINAAN DI MALAYSIA

Loading...
Thumbnail Image
Date
2007-05
Authors
HAJI DIN, MOHD NAZRI
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Increasing number of accident which affected again lives and properties, due to electrical system failure needs to be addressed seriously. Client loss due to project does not comply the contract specification, become controversies issue because they are not satisfied with product given not equal with their cost spent. The main objective of this study is to evaluate performance of contractor and also identify and analyze problems related to the failure to fully comply with the specification. Apart from that, the cases of failure of electrical system to function perfectly have been underline and tlle factors have been identified. Among others, incapability of contractor has been identified as a major reason behind the contractor's failure to fully comply the specification. The study then continues to the specifications which include the design stage, installation/construction, testing and commissioning and maintenance. Study has been also conducted on several bodies related to the issue of specification and to identify the scope of responsibilities and roles to be played by them. The effectiveness of the role played by the parties has been was evaluated through questionnaire form. The form also served as evaluation of the contractor on their knowledge on electrical specification, failure factor, awareness and suggestion and their opinion in these issues. The result from the analysis of the form indicates that the performance and compliance is satisfactorily and not alarming. The step that have been taken and to be taken to resolve the issue is stressed have been out in relation to the respective party involve. The study concludes that the compliance of the electrical specification by contractor in construction industry in Malaysia is not alarming and still in development process. However, special attetionsrequired special attentions to further improve the compliance level.
Description
Keywords
TAHAP PEMATUHAN , SPESIFIKASI PIAWAI ELEKTRIK
Citation